Project Description: To build and assemble a TPI and DAF System for Lube Oil Blending Plant in Phillipine
Product Used in this Project:
Watterson Technology Sdn Bhd
Specialized in Water & Wastewater Treatment System
Okada Technology Sdn Bhd
Specialized in Sludge Dryer System
A study was carried out in a public water treatment plant which draws it's water source from a lake. The water source contained Fluoride with concentration of 1.30ppm at it's highest level. It also contains 0.225ppm of Arsenic in the water source. Read More....
A study was carried out in an Automotive Manufacturing Company to reduce chloride and fluoride level in final discharge water where the chloride level exceeded 2000ppm and fluoride discharge is not consistent. Existing system is using calcium chloride in fluoride treatment, thus contributing to high chloride and scaling in pipeline & final discharge tank. Read More...
A study was carried out in an company which have an etching process to reduce the fluoride level in final discharge water where the chloride level is at 20-30ppm of fluoride and fluoride discharge have not been meeting the discharge standard set by the Department of Environment(DOE). Read More..
A study was carried out in an electronic wafer manufacturer which uses Hydrofluoric (HF) acid for their wafer production lime. This process known as wafer etching contributes not only acidic pH value, but also Fluoride level up to 15,000ppm. Read More..